9.27.2010

External Walls are UP!


 master bathroom bathtub view

 Tired puppy


 living room double sliding door opening

 master bath & bedroom
 living room

 master bedroom

9.25.2010

Total View ... of the House

Good Morning Family and Friends,
We realized this morning that we have not posted a picture of the house as a whole. So here it is... this is what it looks like as of this morning. Next week we will have all the walls up and a roof! Stay tuned.
Love Johanna



9.24.2010

Hard to Keep Up with these Guys!

Well it has been 10 days since I have updated the blog and let me tell you a lot has happened since then. I welcome you to take a look.

Photos taken by guest photographer Keith Garvey.
Putting up the walls (first floor) continued.








Entry of the house with the second floor.


Views from the second floor
Eric  and his project... the stairs.


Stairs going up...
and down.



Second Floor Update (from this week)!
Lifting panels to second floor

Organizing panels according to the numbers



Another beautiful view... notice the snow on the peak... time to move a little quicker before the snow starts flying in town!

THE BEAM
In order to support our roof.







Until the next blog entry... good night for now.

9.14.2010

SIPS first floor

These are some shots from the work that the boys did last week.

Interior Walls of First Level

 
We will be sending more pictures soon!
Love N & J and of course R

9.04.2010

The SIPS Arrive!

SIPs (Structurally Insulated Panels) will be the exterior walls and roof of our home. These are custom built based on our house plans.


After his coffee break, our project manager will direct us on how to put this puzzle together (next week).

Concrete Slab



Pouring the concrete which is going to be our first floor.
The concrete sets for a few days and is showered (with 
sprinklers) to keep it from cracking.

Zone valves
Our first wall!!!