11.21.2010

New Look!

POP-OUT without SIDING
We thought it was time to change our look, since winter is on its way and our house is transforming.  We are thrilled with the progress. Generally speaking we are on schedule, however, Ridgway is due to get its first big snow storm this week. The exterior is almost complete. Nick will be working on plumbing, heating, venting, and electric the next couple of months... he is really looking forward to it (just joking).  
POP-OUT with SIDING as well as SOFFIT
Having sooooo much FUN!

SOFFIT FEVER!

Manager is still on site















We had a bit of a crisis on our hands when a cow "busted" out of its pen. 
The most action Ridgway police has had in a long time. 



11.06.2010

Wass Homestead Update

Ridgway's weather has been cooperating nicely (so far) with our project.

Sewer and water lines are in. "CHECK"


We even had a little help from Dad Wasser!
(a few weeks ago)

And our dear friends Kevin and Chelsea.

 The gas line is in too. "CHECK"


Stucco is almost done as well as the facia and roof drip edge. Take a look!





This is drip edge


Double Slider Door In "CHECK"


Facia and garage door buck

Johanna in the master bath tub

This is a little piece of concrete that spilt over from the deck base posts.

Lots of Love!

Johanna and Nick

Next on the list:
1. Siding
2. Plumbing 
3. Electrical