Gravel has been dumped into the floor base which will help create a solid foundation and allow the boys to prep for the in floor heating system.
The water & sewer disposal pipe has been installed; all part of the slab prep.
Now that Ridg and I have been able to inspect the progress we should see a lot more changes in the near future.
8.08.2010
Since I Have Been Gone PART 2
Since I Have Been Gone!
Check out the latest! Since I have been designated the blogger in the family, there have been no new posts since I was away. YES... away, on vacation, Johanna actually got a vacation. That will be another post however.
So since I have been gone, Nick, Eric and Ridg put in the footers and poured concrete.
So since I have been gone, Nick, Eric and Ridg put in the footers and poured concrete.
![]() |