3.26.2011

WE'RE BACK!!!

Dear Friends and Family,

Nick and I have had a whirl wind winter. We have both been working extremely hard to make our dream true. Nick is working day and night 7 days a week at the house. He got a total of 2 days on the skis and one day of ice climbing. I have been working long hours to keep the project moving (sole money maker right now). Myself 3 days on the skis and zero days on the ice...YIKES!


We spent the holidays in NJ with my parents. It was snowy but pleasant! Nice break from the project.
Dad and Nick toasting the New Year with some Irish Poitin
 


Back to work in January
Insulation:


Insulation made out of JEANS!




Nick's "Goat" T which has since been cut off


Our Beloved PUP

ROOF: Check!


DRYWALL & PAINTING:




prepped floors to protect them from drywall mud & paint


Master Bath half wall for toilet 

Textured walls in Kitchen/Dining area

Nick in his "suit"



It's been a hard dayz work!!!

Eye protection? Oops





Half wall in master bath



 Electrical switches and plug have been installed... thanks to the help of our dear friend Willy. Thanks Willy, Nick appreciates the help for sure!

NEXT WEEK... wood floors and cabinets

12.19.2010

Merry Christmas!


For the past month Nick and Eric have been very busy. The boys have framed in all of the rooms and installed the heat tubes for the upstairs in floor heating system. The outside of the house is almost completely done! The siding is finished and the deck is half way there! Stucco is now complete as well! Nick in his spare time has been doing plumbing *which is almost complete and the required air to air heat exchange (HRV). Here are some pictures that capture some of their hard work.

FRAMING & IN FLOOR HEATING TUBES
Powder Room

Master Bedroom looking into Great Room

Stairs to Second Level

Nick standing at the Kitchen Island waiting for a meal. 

Kitchen looking at the Great Room

Notice the tubes on the floor, they will heat the floor which will be our main heat source. The tubes will be covered with concrete and then we will lay bamboo flooring on top of the concrete. You can also see the sink rough in plumbing on the left and the air to air heat exchanger vent in the island.



SIDING & DECK


 





UTILITIES & PLUMBING
Gas Hooked Up!

Electric Hooked Up!

Air to Air Exchanger/exhaust and supply

Laundry Room Plumbing! There is much more but we will not bore you.

We are looking forward to having you come and visit!!!
Merry Christmas and Happy New Year!

11.21.2010

New Look!

POP-OUT without SIDING
We thought it was time to change our look, since winter is on its way and our house is transforming.  We are thrilled with the progress. Generally speaking we are on schedule, however, Ridgway is due to get its first big snow storm this week. The exterior is almost complete. Nick will be working on plumbing, heating, venting, and electric the next couple of months... he is really looking forward to it (just joking).  
POP-OUT with SIDING as well as SOFFIT
Having sooooo much FUN!

SOFFIT FEVER!

Manager is still on site















We had a bit of a crisis on our hands when a cow "busted" out of its pen. 
The most action Ridgway police has had in a long time. 



11.06.2010

Wass Homestead Update

Ridgway's weather has been cooperating nicely (so far) with our project.

Sewer and water lines are in. "CHECK"


We even had a little help from Dad Wasser!
(a few weeks ago)

And our dear friends Kevin and Chelsea.

 The gas line is in too. "CHECK"


Stucco is almost done as well as the facia and roof drip edge. Take a look!





This is drip edge


Double Slider Door In "CHECK"


Facia and garage door buck

Johanna in the master bath tub

This is a little piece of concrete that spilt over from the deck base posts.

Lots of Love!

Johanna and Nick

Next on the list:
1. Siding
2. Plumbing 
3. Electrical