Ridgway's weather has been cooperating nicely (so far) with our project.
Sewer and water lines are in. "CHECK"
We even had a little help from Dad Wasser!
(a few weeks ago)
And our dear friends Kevin and Chelsea.
The gas line is in too. "CHECK"
Stucco is almost done as well as the facia and roof drip edge. Take a look!
 |
| This is drip edge |
 |
| Double Slider Door In "CHECK" |
 |
| Facia and garage door buck |
 |
| Johanna in the master bath tub |
This is a little piece of concrete that spilt over from the deck base posts.
Lots of Love!
Johanna and Nick
Next on the list:
1. Siding
2. Plumbing
3. Electrical