8.08.2010

Since I Have Been Gone PART 3

Gravel has been dumped into the floor base which will help create a solid foundation and allow the boys to prep for the in floor heating system.

The water & sewer disposal pipe has been installed; all part of the slab prep.



Now that Ridg and I have been able to inspect the progress we should see a lot more changes in the near future.

No comments:

Post a Comment