Gravel has been dumped into the floor base which will help create a solid foundation and allow the boys to prep for the in floor heating system.
The water & sewer disposal pipe has been installed; all part of the slab prep.
Now that Ridg and I have been able to inspect the progress we should see a lot more changes in the near future.


No comments:
Post a Comment