12.19.2010

Merry Christmas!


For the past month Nick and Eric have been very busy. The boys have framed in all of the rooms and installed the heat tubes for the upstairs in floor heating system. The outside of the house is almost completely done! The siding is finished and the deck is half way there! Stucco is now complete as well! Nick in his spare time has been doing plumbing *which is almost complete and the required air to air heat exchange (HRV). Here are some pictures that capture some of their hard work.

FRAMING & IN FLOOR HEATING TUBES
Powder Room

Master Bedroom looking into Great Room

Stairs to Second Level

Nick standing at the Kitchen Island waiting for a meal. 

Kitchen looking at the Great Room

Notice the tubes on the floor, they will heat the floor which will be our main heat source. The tubes will be covered with concrete and then we will lay bamboo flooring on top of the concrete. You can also see the sink rough in plumbing on the left and the air to air heat exchanger vent in the island.



SIDING & DECK


 





UTILITIES & PLUMBING
Gas Hooked Up!

Electric Hooked Up!

Air to Air Exchanger/exhaust and supply

Laundry Room Plumbing! There is much more but we will not bore you.

We are looking forward to having you come and visit!!!
Merry Christmas and Happy New Year!

1 comment:

  1. The house is truly wonderful. What a fantastic space your new home will be!

    ReplyDelete