5.04.2011

Counter tops Install

Well, this is a good sign two blog posts in one week.

Today was a BIG day the counter tops have been installed!!!

Nick is in control!


Delicately moving the "granite and limestone"




Notice the FRIG!! (installed yesterday)


Future location for the cooktop


Incredibly sexy sink, if there is such a thing.

Limestone Master Bath Vanity top


Shower bench... is absolutely gorgeous!!

Laundry room... with a pocket door (Thanks Eric!)


Guest bathroom!!!

No comments:

Post a Comment