Well it has been some time since I have been able to update the blog, between endless traveling with work, Nick continuously working on the project and trying to stay healthy; we have not been current with the blog. HOWEVER... lots is going on.
This is what happened before the concrete slab was poured...
Setting up zone valves and tubing for in floor heating system.
Check out the latest! Since I have been designated the blogger in the family, there have been no new posts since I was away. YES... away, on vacation, Johanna actually got a vacation. That will be another post however.
So since I have been gone, Nick, Eric and Ridg put in the footers and poured concrete.